Demonstrating managed aquifer recharge as a solution for climate change adaptation: results from Gabardine project and asemwaterNet coordination action in the Algarve region (Portugal)


Submitted: 28 April 2014
Accepted: 3 March 2016
Published: 30 September 2014
Abstract Views: 895
PDF: 387
Publisher's note
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.

Authors

In the Algarve southern Portugal region, Managed Aquifer Recharge (MAR) research activities have been developed to provide not only water surplus storage in aquifers during wet years, focusing in the Querença-Silves aquifer (FP6 ASEMWATERNet Coordination Action), but also groundwater quality rehabilitation in the Campina de Faro aquifer (FP6 Gabardine Project). Following MAR research potentialities in southern Portugal, this paper describes the objectives, conceptual demonstration, background and capabilities of one of the selected Circum-Mediterranean pilot sites (in Portugal) that will be researched in the new FP7-ENV-2013-WATER-INNO-DEMO MARSOL project, which started Dec. 1st, 2013. In the Algarve pilot site, several case-study areas will be located in the Querença-Silves aquifer and in the Campina de Faro aquifer.

Lobo Ferreira, J. P., & Leitão, T. E. (2014). Demonstrating managed aquifer recharge as a solution for climate change adaptation: results from Gabardine project and asemwaterNet coordination action in the Algarve region (Portugal). Acque Sotterranee - Italian Journal of Groundwater, 3(3). https://doi.org/10.7343/as-080-14-0106

Downloads

Download data is not yet available.

Citations